This past Wednesday, with the help of John and David from Lexington Electrical in Columbia SC and my SIL, we pulled electrical drops for 1/2 the hanger (Daughter and SIL using the other half for storage until they are ready to build.
Attachment 460425Attachment 460426
And with that, Thursday was 'move-in' day. Actually, the equipment was all there, it was just time to move into positions I think will work.
Attachment 460427
Down the right (front to back) drill press, bandsaw, drum sander, planer. Down the center, slider and down draft table. Down the wall, antique, hot-rodded Rockwell lathe, the 26" lathe, grinding station, and the RAS. Still working on final locations for everything, planning DC piping (DC will be in a to-be-built closet in the far right corner) and trying to keep everything from being located directly under the skylights. Still need to locate the scroll saw and miter saw.
It was great being to be able to bump the machines since they haven't run since August of last year. Need to start turning! I've got pecan from a family who wants mementos from the tree their father/grandfather planted.