Tools Needed:
1/8” Allen Key
3/16” Allen Key
5/32” Allen Key
4mm Allen Key
˝” socket
Bonker of some ilk
Dowl
New Triple Sealed Nachi Bearings Kit #9706 and 9708 from VXB(on right)
Tools.jpg
Bearings.jpg
Removal:
1. Unplug the lathe.
2. Loosen the 2ea 4mm set screws in hand wheel, then unscrew hand wheel.
Hand Wheel.jpg
3. Loosen the 3/16” screw in clamping nut on back of headstock
Clamping Nut.jpg
4. Raise the motor up to loosen tension on the belt, and tighten in place.
5. Open access door. Remove belt off of lower motor pulley.
6. Loosen the 2ea 5/32” set screws in the upper shaft pulley. Screws are 180 degrees out from each other
Upper Drive Pully.jpg