:-) Glad I'm not the only one! The good news is that while the first time around (including prepping the rough lumber) took me about 5 hours, the second time only took me about 1.5 hours since I had it all figured out already.

This time I was able to plan the front leg joint to allow the stretcher connection noted above. I'll post pics soon