Quote Originally Posted by derek labian View Post
My electric company specified a specific style meter can and configuration with an internal cut-off. I opted to add a 400a fused safety disconnect before feeding the main panels.

I was specifically looking at your 320/200a quote. I thought the prices were too high.

RE the CT Cabinet, I see a bunch of various CT Cabinet configurations on eBay, but I'd have to research 600a service to say anything else. There are options other than eBay or the electrician, once you know what you need you can search the internet for a good deal. Most power providers publish the specs of service requirements in detail, if you haven't reviewed that, you might want to. If you have reviewed it, it should indicate what type of CT cabinet configuration you need. I would expect most of the cost to be the labor.

Good luck!
Thanks I will definitely check that out and see if I can find the specs for what is required.