On my Fine Line Automation I was going to use both a 1/2 inch sheet of plywood (first layer) and a 3/4 sheet of MDF but now just thinking the 3/4 inch will be enough. I am someday going to install the tracks I have for hold downs, which would involve routing out the slot for the track. Suggestions?