Hi! Just rough turned the first bowl blanks I have ever ordered. They were really wet. Pegged my meter out wet. Anyway, I turned them down to about ten percent of width and coated them with anchorseal. Now the inevitable question; how long do I need to wait to finish them? I know there are a lot of variables, but could someone give me a general idea? First time I ever opened a can of anchorseal, also. David