I've got to do a 2 day demo for my Guild in a couple months, so I've been busy getting my mini lathe rigged up for it. I wanted to be able to set up and break down the rig easily. I welded a frame for the vacuum pump that rides on the center stretcher of the lathe stand. The hose from the filter to the gauge assembly has a 1/4" quick connector on one end and the gauge stalk connects to the lathe bed with 2 screws. I think it's ready!