Need 2 more dados milled...Drawer #5....then, rip the blanks for the Drawer backs (5) and then figure out HOW to saw the panels for the drawer bottoms..so I can do some assembly work.
Top is about ready to be planed flat, and the Bread Board ends installed...maybe this coming Friday?
Don't have enough 3' long clamps to do all 5 drawers at once...maybe 2 a day?
Might just be a Busy Week? "Busy, busy...BUSY"
Stay tuned..