That's not for the shop, Eric. The service to our home is being increased from 200 amp to 400 amp and that calls for a 320 amp meter housing for whatever reason electrical math dictates. The supply will be split after the meter...200 amps to the house via the automatic transfer switch for the generator as it is now and 200 amps to the shop via a disconnect (independent main breaker next to the meter). The supply line will traverse about 115' of conduit, underground other than about 25' at the house.