i know alot of you guys have skills outside of WW so i figured i'd ask.
i'd like some advise on how to make this connection and i also realize that i may need to undo what i've done. Platform tub on slab. 2" roughed in drain line. I went ahead and connected the overflow and drain as a unit...to the tub but it's unclear to me (a) if the order is right...should i have not done this yet and (b) how to make this connection. i'm sure i'm going to need to raise the platform some -- what you see right now is the tub sitting flush on the deck before durock/tile so without me raising the deck the unit will rise about 3/4" but i think i'll need to add another 1.5" to have some working room.
i figured i'd use a 2" street 90 adn then ??maybe?? some flexible 1.5" PVC to connect this but advice sure is welcome