Woo, hoo! Sub-panel is in. Inspector will be here tomorrow morning. Once that's out of the way, I can get to finalizing footprint and proceed with getting circuits and air in place, followed by figuring out my dust collection which will be fun. Hopefully, in a week or two, stuff will be usable.
IMG_9605.jpg
The lathe (broken down into components) remains at the old shop. I think my plan for moving that is to do so concurrent with the timing of moving the Kubota (Big Orange Power Tool - "BOPT"). I can load the heaviest piece onto my trailer with the BOPT, move said BOPT to the new property with the 6x12 UHaul rental I need to do that, transport the lathe and then unload it with the BOPT at the new place. No hurry on that for now because it's taking time to sell the old property (nature of the property and the price) and it will not be in my way as I deal with circuits and air as noted above.