Hi All,
I have two questions concerning dust port sizes and Y connections.:
I am setting up a new shop and routing the main 8" spiral pipe branch into a 16"x16" cast trench in the slab. The new layout includes running from the 5HP DC unit tying into it a table saw with an existing 4" port, a 8" jointer with the same port configuration and then a 16" jointer that I will fabricate a 6" port, after that it goes into a W at the opposite wall with risers going up the wall feeding a 6" horizontal run for each leg of the W. The question is do I change the 4" ports on the TS, Jointer, 15" planer to 6"?
Next question is from the Y's I intend on using flex house, is this a sane approach?
There are a few more questions but I would be delighted to get some confirmation on the two above.
All responses humbly appreciated.
Many thanks,
Ken
Corrales, NM