Yes, I didn't mention that in my previous reply, Rick, but "the next shop" will have a simpler approach than I have now for the 240v side. Only the DC, compressor and CNC will have "dedicated" 240v circuits; the DC and compressor for obvious reasons and the CNC because it's a 4-wire circuit. None of the other tools ever are running at the same time, so that will be a single 30a circuit with multiple receptacles. Right now, I do have the luxury of a 200 amp panel with lots of physical space, so all the dedicated circuits added over the years don't matter too much, but that's not going to be the case with "what comes next".