The vanity I been working on is moving along. I got my hands on a pile of spalted curly maple, and basically it was just enough to build the face frame, doors and drawer fronts. I tried to keep the spalted parts to the doors and drawer fronts and the curl in the face frame. I wish I had a bit more of it so I could have been a bit more picky about some of the parts. The base is already in 'finishing' and there is one door to show the spalting.
20201127_115144.jpg
20201127_115230.jpg