Originally Posted by
Robert Mayer
Finally got this taken care of! About $650. Added in a tandem outlet and my jointer is up and running. The only weird thing is the 110v dedicated he installed is tripping the breaker pretty quickly whether i plug in my table saw or dust collector. I think the outlet he used must be bad. Got him coming back out soon. The 240v works perfect.
I really am going to reevaluate my career options should anything ever happen to my current job. I am in the wrong line of work if these guys could get $3600 for doing a easy subpanel.
Great. Glad you got it going.
"A hen is only an egg's way of making another egg".
– Samuel Butler