I bought a 7.2 kw grid tied system to install on the shop. In order to make the numbers work I have done all the roof work myself. I had banked some work hours with the friends pictured so no labor costs other than the electrician who is coming in this week. I was in the solar business back in the 70’s, 80’s. The Iron Ridge Rack system was excellent other than the fact that I had to punch 84 holes on my perfectly good 5 yr old roof. I had the guys lined up to hit this and get it done in a couple days and then we all stayed home, so On that 8/12 I did the racking myself. At 71 it like to kick my butt, but short days and no hurry. Slow and steady wins the race. Life is a humbling experienceB9428CAF-9781-4B63-8D4D-F25C370A6591.jpg90B1B84A-FDB0-48B3-85BD-AEE035A6EE01.jpg16B4CEFE-9FE9-41E5-A434-9AE9AA4010CD.jpgF78D3AC5-DA4A-416F-9AD4-7EB125AED128.jpg