I'm looking for advice on if my runs are too long for my HF 2HP DC. I was planning on using 4" trunk lines along the wall (above the ceiling) going on both directions to minimize distance. Still I have some fairly long runs. Here are the drops I have planned and the distance to the blast gate for that tool. The shop is 20x30 with the DC in one corner
Lathe: 24'
8" jointer: 41'
delta unisaw: 55'
miter saw: 14'
sweep port: 28'
radial arm saw: 44'
These sound kind of long so I'm concerned that it simply can pull that distance. One man shop so will only be one gate open at a time.