I'm trying to figure out my ducting for a probable KF700 purchase. It would be great with some insight of the usage of the dust ports.
There are 4 ports on the saw:
1. Saw blade under side, 120mm
2. Saw blade overhead guard (maybe 80mm?)
3. Shaper fence, 120mm
4. Shaper under side, 80mm
I'm trying to plan the placement and combination of blast gates. How do people switch between saw and shaper in terms of dust collection?
Possible scenario 1:
- Use only one 120mm and one 80mm hose. Move these hoses between saw and shaper ports when needed
Possible scenario 2:
- Have all ports connected and switch between saw/shaper with blast gates
Thanks
//Michael