The task for today was to raise the outside hose bib a couple of feet. This involved moving it a few feet to the east so it would go into a closet wall, so the freeze proof faucet didn't come thru the wall.
Anyway
Hole in the closet wall, reroute pipes in the basement, new hole thru the siding, patch the old hole, patch the closet wall etc, etc. Every step required three tries and ten tools.
The shop is in the basement and some stuff is in the garage. Must have climbed the stairs 60 times. Phew!
Tom