Hi,
This is a follow-on to my other thread about using a coupling nut with a threaded rod for a leveling platform for a job-site table saw. I want to be able to use epoxy to permanently affix two nuts (one above and one below the platform with the table saw on it) to the threaded rod. What do I need to do to prepare the rod and nut so that the epoxy will best be able to bond to the material?
Thanks,
Rob