Attached are three layouts for pipe runs in my new basement shop. DC is a CV1800 and i’ll run 5” PVC pipe. Machine layout is probably 90% accurate, meaning there will be minor changes like likely swapping the position of the DP and big BS.
Major machine drops will be to the jointer, RAS, BS/DS area, and planer/TS. Having a run that goes across the TS blade would be nice for a future drop to an over the blade DC setup a la Shark Guard.
All change of directions will be with 45’s or long radius 90’s, whichever are available.
I’ll have wyes with caps at most turns to allow for future, such as at the jointer where I could pipe to the large for example, or over the bench for a sanding drop.
Please review the drawings and and let me know what you all think.
Thanks!