Results 1 to 9 of 9

Thread: New Moravian Bench build Part 2

  1. #1
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288

    New Moravian Bench build Part 2

    The old thread was getting a little long in tooth.

    Friday night I screwed up one of the long stretcher tenons. After several rounds of "what if" and "yes but" I made the correct decision and went to the woodstore Saturday and picked up a nice hunk of 12/4 Poplar and started over.

    Here are some photos of cutting the new tenons.


    V'ing the knife line:

    benchVKnifeLine.jpg


    Sawing the shoulder:

    benchSawShoulder.jpg


    Finished tenon:

    benchLongStretcherTenon2.jpg


    Next up is fitting the tenons to the base units. Once that is done I'll clean up the base parts and glue 'em up. Then comes the fun part, glueing up the slab. I and my back keep hoping to find a 12/4 slab of something that is wide enough for the slab but so far no joy.


    ken

  2. #2
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288
    I've finished fitting the long stretchers to the legs.

    benchFittingLongStretchers.jpg


    That's all for today, it is starting to get hot in the shop. Pool time with MsBubba, Sweet Maggie Dog and a ball. Then short nap followed by monkey suit on and then off to sit in a black box for a couple of hours. If it has cooled off once I'm back home I'll start prepping the base unit parts for glue up.

    ken

  3. #3
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288
    I'm cleaning up the base legs and stretchers in prep for glue up. There are a couple of boo-boos, mostly cosmetic with no effect on the structure, that I decided to live with but other than that I'm happy with the progress but the real tell is how the base units come out of glue up.

    benchCleaningShortStretchers.jpg

    The legs are finished, four more short stretchers to go.


    ken

  4. #4
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288
    With two days off over the weekend I only managed to get one base unit glued up. There was too much running the streets, honeydoes to be done, and entertaining MsBubba in the pool to get to the second unit.

    The first base unit out of the clamps:

    benchBaseUnit1.jpg

    Second base unit awaiting glue up:

    benchBaseUnitPreGlueUp.jpg

    Saturday evening was our first Monsoon rain of the season. Most of the day MsBubba was complaining about Monsoon being a bust and we were not getting any rain. Wrong pool breath, the thunder soon ran us out of the pool followed very shortly by rain.

    View out the back garden:

    monsoonBackGarden.jpg

    In 30 or so minutes it rained enough to fill the pool, turn the back gully into a raging river as it did the street in front, and flood my shop, which never happens.

    shopFlood.jpg

    We got a second Monsoon rain Sunday night, not as much but still pretty good.


    ken

  5. #5
    Join Date
    Aug 2012
    Location
    Missouri
    Posts
    1,515
    Bench coming along well. It may only be in the southwest where a 30 minute storm can substantially change your entire landscape view. Good thing your shop will dry quickly in hours instead of days.
    Jim

  6. #6
    Coming along great Ken!
    Stay dry.
    Fred
    "All that is necessary for the triumph of evil is that good men do nothing."
    - Sir Edmund Burke

  7. #7
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288
    Quote Originally Posted by James Pallas View Post
    Bench coming along well. It may only be in the southwest where a 30 minute storm can substantially change your entire landscape view. Good thing your shop will dry quickly in hours instead of days.
    Jim
    Jim,

    Thanks, the bench is getting there. There are a couple of places where I could have done better but nothing that affects the structure. I expect it will end up as a small but usable bench. I'm still back and forth on the vise, either a traditional wood screw with parallel guide or a BC metal screw with a crisscross, right now it's a coin flip which it will be.

    The shop dried almost as quickly as it happened with no real damage.

    ken

  8. #8
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288
    Quote Originally Posted by Frederick Skelly View Post
    Coming along great Ken!
    Stay dry.
    Fred
    Fred,

    Thanks, It will get there if I can get a couple days off in a row and stay out of MsBubba's line of sight .

    ken

  9. #9
    Join Date
    Feb 2012
    Location
    Tucson, AZ
    Posts
    2,288
    Work combined with WX has kept me out of the shop for most of last week. I've today and tomorrow off but shop temps may still slow the work product down. This time of the year in the desert you just have to give in.

    I did glue up the second base unit this AM before it got too hot. It went together a little out of square but I was able to pull it close enough for bench work.

    benchBase2GlueUp.jpg

    Slab is next, I'm still looking for a one piece slab but may end up with a glue up.

    ken

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •