Hi guys,
Still designing my dust collection.. I was thinking about having one pipe run on the floor to my table saw, but not sure how I like the tripping hazard. If I do a ceiling run with a drop, where is the best place for the drop to go? I'm thinking the back right corner (standing from infeed) just beyond the maximum range of the fence... Good spot? Or is a floor run better?