Results 1 to 15 of 132

Thread: New shop build, the MBS

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    Join Date
    Aug 2009
    Location
    Colorado Springs
    Posts
    360
    Here are a couple of shots after we set the metal beam. Will add two metal columns later, and bolt and tack weld everything down.

    92D69124-F880-4CBF-9B16-6D03521F83AE.jpg91C08A78-7728-4DE2-AA4D-FCEA70DFBDDD.jpg

    And basement flatwork poured, sump pipe to pit, and stairs formed.

    71D208A0-7640-496B-B9C4-E4E628B9B662.jpgEB7E8513-61A8-480C-8592-CEFAF3BA892F.jpg

    Basement stairs poured.

    63AE50CB-B972-422E-9B1A-6ED6CFAFE016.jpg6BFA5593-0559-4672-AD35-9CFB1D3A1E0E.jpg
    Last edited by Jon Snider; 03-13-2019 at 6:52 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •