Hi All,
I'm in the throes of shop planning and one of the bigger challenges I'm facing is how to move machines into my basement workshop. Luckily my basement is a walkout, however the lot is sloped which adds an additional layer of complexity. I guess I should count myself fortunate, as it's better to deal with a grade than a staircase.
Here's a picture of the rear of my house. The machine(s) would be travelling from the right hand side (which is paved), over to the left where the basement entrance is located.
Any suggestions on how to go about tackling this?
IMG_2389.jpg