In the past 6 weeks I have sold some of my machines that I dont use often enough and I have decided to go separate, I sold my combination machine and bought separates to replace the combination - my workload has changed into production heavy and the combination machine can not keep up with the work.
What I havnt thought about thoroughly when I made the decision to go separate was the amount of ducting and iterations of the ducting required - this took me over 2 weeks (I have a daytime job and I can only do this after 5 and half days on the weekends), and a minor increase in the 3 phase electrical power point
anyhow, here are the before and after....
Before
12932718_10153776263428813_6469839596289796135_n.jpg12931243_10153776267558813_5727013530654399046_n.jpg1936153_10153776263493813_5422189849406990148_n.jpg
After
IMG_3136.jpgIMG_3137.jpgIMG_3138.jpgIMG_3120.jpg