Hi All,
In the ongoing framing of Bathroom mirror with trim:
The decorative trim will be glued/siliconed to a small backer piece that surrounds the mirror. Backer piece will be thin, long painted scrap.
Of course, the sheetrock and mirror on it are not in the same plane. Anywhere from 1/8 to 3/8" step off; this final backer/mirror relationship has to be consistent.
I plan on using Liquid Nails to adhere the backer piece to the sheetrock.
My question is............... How long will I need to let the Liquid Nails cure if, in some areas, it will need to do perhaps 1/8" to 3/16" gap filling duty?
This is not structural.
(BTW, I got the Silicone adhesive advised a few weeks ago, and ran a sample on glass-very strong, enough for my purposes. Am not sure I have enough Silicone to use for the above question.)
As always, thank you
David