Quote Originally Posted by Kent A Bathurst View Post
Well........the battle orders I operate under say no sanding required between coats if I can get the 2d coat down in 12 - 24 hours. Beyond 24 hours I sand. Usually I'll wait 36 - 48. If you are getting gummy stuff, then it isn't dry enough, I'd guess. I get fine, amber dust.

Kent, I follow the same orders with these products, though I don't usually wait much longer than the 24 hours. A good brushed on coat with proper drying and humidity is 98% of the time ready for sanding from one day to the next + a few hours. I can tell very fast if the finish needs more dry time. I never wet sand unless I am at 5 or 6 coats and going for a mirror finish.