Packed it up and dragged it over to the clients house today. Got to the shop at 8 and didn't get on the road until 10:30. All I had to do was put a back on a cabinet and mount the doors. The rest was just loading and travel. Got there and unloaded, then it was noon so we had lunch.
Went in pretty smooth, a few minor adjustments had to be made because I never fit it in the shop. Just trusted my measurements. Most were less than 1/16" adjustments. So all was good.
Here are the pics. Did the cabinets in the background too, that was the 1st phase. One more phase to go, the paneling.
Here is the backside of the bar, no counters yet.