Results 1 to 2 of 2

Thread: Shipping ????

  1. #1
    Join Date
    Jun 2007
    Location
    Pleasant Valley, New York
    Posts
    140

    Shipping ????

    Shipping from Canada to NY. How long should it take???

    Got the call that lathe shipped on the 7th last Wed. Fliped out shed not finished, but today had inspector over and he failed me at 11am. Wanted a couple more joists every 4 feet to tie rafters in, but there is coller ties already there he said they were usless. Had a couple of 2 x 6 left over so I made some storage on the ends. This is what he liked.

    So off to the borg to pick up 3 more 2 x 6 x 16 with my little truck and spaced them out every 4 feet looks crazy stupid but at 3 pm we passed nice enough to stop back instead of taken another day off..
    ( they have to find something)

    BUT STILL NO CALL FROM TRUKING COMPANY ON A DROP OFF DATE??????????
    Last edited by John Keeton; 12-13-2011 at 6:04 AM.

  2. #2
    Collar ties are useless? Hmmmm.......... Ridge beam or board? How big is this shed? And joists don't tie rafters in, they tie the walls together.........

    Sorry about your lathe, hope it shows up today!

    Rich

    PS Not all inspectors "have to find something"............
    *** "I have gained insights from many sources... experts, tradesman & novices.... no one has a monopoly on good ideas." Jim Dailey, SMC, Feb. 19, 2007
    *** "The best way to get better is to leave your ego in the parking lot."----Eddie Wood, 1994
    *** We discovered that he had been educated beyond his intelligence........
    *** Student of Rigonomics & Gizmology

    Waste Knot Woods
    Rice, VA

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •