Mike Goetzke
07-30-2007, 9:43 AM
I built the arbor based on a Wood Mag. design. Believe it or not it has around 300 pieces (when you include all the small lattice spacers)! Took about 3-full weekend days of work:
(click image to enlarge)
http://img.photobucket.com/albums/v212/mbg/th_IMG_1218_1_1.jpg (http://img.photobucket.com/albums/v212/mbg/IMG_1218_1_1.jpg)
Well I still need to build the swing and put in the landscaping. There are separate plans for the swing. They call for white oak but I would rather stick with cedar - would cedar be O.K.?
Thanks,
Mike
(click image to enlarge)
http://img.photobucket.com/albums/v212/mbg/th_IMG_1218_1_1.jpg (http://img.photobucket.com/albums/v212/mbg/IMG_1218_1_1.jpg)
Well I still need to build the swing and put in the landscaping. There are separate plans for the swing. They call for white oak but I would rather stick with cedar - would cedar be O.K.?
Thanks,
Mike