Gary Herrmann
12-19-2006, 7:16 PM
My current client kicks the IT consultants out after 12/15 since thats the code freeze date.
I've gotten some nice fruit wood blanks, have some pen blanks to work on. I'm supposed to be making LOML a yellow heart and bloodwood box. I need to make several jigs.
What do I spend my time doing? Changing out bathroom fixtures and painting. I might get some shop time tomorrow morning waiting for the gas guy to come install some sort of remote reading sensor (actually kinda interested in seeing that). SWMBO has told me that if I'm in the shop "running a loud machine and miss the doorbell, we'll have to reschedule".
Hmm. The lathe isn't that loud...
If I don't steal some shop time before she gets off work (starting Thursday till 1/2, I'm gonna be working on the house the whole time I'm off.
For those of us that have basement or garage shops, we need some sort of co-op so we can get out of the dang house. ARGH.
I've gotten some nice fruit wood blanks, have some pen blanks to work on. I'm supposed to be making LOML a yellow heart and bloodwood box. I need to make several jigs.
What do I spend my time doing? Changing out bathroom fixtures and painting. I might get some shop time tomorrow morning waiting for the gas guy to come install some sort of remote reading sensor (actually kinda interested in seeing that). SWMBO has told me that if I'm in the shop "running a loud machine and miss the doorbell, we'll have to reschedule".
Hmm. The lathe isn't that loud...
If I don't steal some shop time before she gets off work (starting Thursday till 1/2, I'm gonna be working on the house the whole time I'm off.
For those of us that have basement or garage shops, we need some sort of co-op so we can get out of the dang house. ARGH.