stephen wood
02-01-2017, 7:04 PM
I'm going to make a floating bath vanity. I plan on using a lock-miter joint with help from Alan Schaffter's setup jig. I want to wrap the vanity with veneer i purchased. Should I apply the veneer to the plywood before I cut the lock-miter joints or after I assemble the case?
Also my wife wants me to put a drawer/door in the front of the vanity. Again should I apply the veneer before or after? She wants a seamless look to the whole thing!
Thanks
Also my wife wants me to put a drawer/door in the front of the vanity. Again should I apply the veneer before or after? She wants a seamless look to the whole thing!
Thanks