Do you find that the time estimate, found on the preview screen, is reasonably accurate?
For me, it always seems to estimate about 20% faster than it should. Meaning it takes 20% longer to do the job than it estimates.
I also thought this was very strange: I was doing a raster design and cutout that I needed 2 copies of. I added a second one to the project, right next to the first, and the estimated work time jumped from 24 minutes to 62 minutes. I thought for sure it would be FASTER doing both together as the x axis overswings would only have to be done once per line. Am I missing something? Or is the estimation just probably off for some reason?
Do you find that the time estimate, found on the preview screen, is reasonably accurate?
For me, it always seems to estimate about 20% faster than it should. Meaning it takes 20% longer to do the job than it estimates.
I also thought this was very strange: I was doing a raster design and cutout that I needed 2 copies of. I added a second one to the project, right next to the first, and the estimated work time jumped from 24 minutes to 62 minutes. I thought for sure it would be FASTER doing both together as the x axis overswings would only have to be done once per line. Am I missing something? Or is the estimation just probably off for some reason?