Joe Shinall
01-04-2011, 11:14 PM
Ok, so after multiple DC questions, I have redone my shop layout to minimize the length of runs and have cut them in half. Here is a picture of the layout. Now instead of going up walls and over to the wall where my Jointer, RAS, miter saw, and lathe are, it just goes down the wall of the machines. I do have one run going up about 8 feet, over 10 feet, and down 8 feet.
I have the 2HP HF DC and I am going to run 6" piping because now I have found it for $2 a foot at a local plumbing supplier. So it cuts my total cost from what I figured was about $500 down to about $120. Thanks to the guys in my other thread that mentioned the 2729 sewer drain pipe.
So now my longest run will be about 26 feet as opposed to 40 feet as I thought before. So is this doable with my little HF cheapie with a Wynn filter????
I have the 2HP HF DC and I am going to run 6" piping because now I have found it for $2 a foot at a local plumbing supplier. So it cuts my total cost from what I figured was about $500 down to about $120. Thanks to the guys in my other thread that mentioned the 2729 sewer drain pipe.
So now my longest run will be about 26 feet as opposed to 40 feet as I thought before. So is this doable with my little HF cheapie with a Wynn filter????