For those that are following along with the shop build out, the final phase starts in one week. I will be framing the entire shop for interior walls first, then running 750 ft of electrical wire and 30 receptacles along the walls as well as ceiling drops for 240V and 120V in key areas. I'm also adding 16 new LED shop lights. Also running Rapidair Maxline compressed air distribution system in the walls to each shop and the paint room.
After all that we will be closing in the shop walls with OSB (budget friendly) with 7/16" sheets on the top and bottom of the walls and 5/8" in the middle for more "meat" in attaching fixtures and such. And finishing the wall that adjoins the tiny house with steel just like the paint room. I decided against steel wall coverings everywhere due to noise reflections and difficulty in attaching stuff to the walls. The OSB means I can hang anything anywhere. I haven't decided whether to paint it yet, I've been going back and forth on it, going to wait til it's up first and see how it looks.
Once this is all done, the shops will be fully functional and ready to build stuff.
Pictures to come. Stay tuned.