Considering having a deck built. It is a bigger project than I want to tackle myself. One contractor is telling me that setting the support posts is best done by digging the post holes per local code (42" deep) pouring a concrete footing the set in the posts and back fill. He does not fill the entire hole encasing the post in concrete because they will rot faster if encased in concrete.

Thoughts......