Thread: Face frame first process for cabinet?

  1. #1

    Face frame first process for cabinet?

    I've got about 6 cabinets under my belt; never built the same way twice. I'm thinking more about process this time.
    This will be one bathroom cabinet fitting in between two walls; a span of about 44 inches.

    I read last night about making the face frames first. My concern is being able to have the resulting carcass line up exactly with the face frame. If the two don't line up just so then it seems like more work to adapt the carcass to the face frame than the other way around. I use Sketchup so I guess I can work through the details first. Just looking for opinions on this approach.

    thanks!

  2. #2
    Join Date
    Nov 2013
    Location
    Waterford, PA
    Posts
    1,243
    I'm no expert, but have done several complete kitchens. I build and install the carcases first. Then I create a story stick for each group of cabinets that will share a face frame and make that frame match the story stick.

    Since you're only making 1 carcase, you shouldn't need to use that process. Just make the carcase slightly narrower than the space and create the face frame to fit the inside dimensions of the carcase. Leave stock on the outside edges to allow you to scribe them to the wall, as the chances of the walls being dead plumb are iffy.

  3. #3
    If your doing any amount of CAD (sketchup) with accurate drawings, dimensions, stock, and material, sizes it should mean nothing as to which component you build first. We build flush interiors so that is the most critical dimension. Most shops build 1/4" faceframe overhangs so other than shelf dimensions it doesnt matter if the interior come and go a bit and the inteior/exterior overhang allows a mile of fudge factor.

    We build boxes and faceframes at the same time to fixed dimensions. If your not drawing in SU with your real world materials and running flush interiors you'll have trouble.

    If your doing the drawing you say and using accurate material and space dimension there is really no order to the process other than what works best for your tooling setup at the moment.

  4. #4
    Join Date
    Mar 2006
    Location
    Fort Wayne, IN
    Posts
    572
    In one of the classes I took at the Marc Adams school I seem to remember that Marc said when he was running a cabinet shop he'd make and assemble the face frames first with shallow dados for the plywood. That made it easy to square the cabinet and size the panels. He said it made assembly faster as well.

    Cliff
    The problem with the world is that intelligent people are full of doubts, while the stupid ones are full of confidence.
    Charles Bukowski

  5. #5
    Join Date
    May 2013
    Location
    Northern Virginia
    Posts
    1,376
    Blog Entries
    3
    I prefer the order of face frames, then doors and drawer fronts and finally boxes.

  6. #6
    Join Date
    Apr 2010
    Location
    Nashville, TN
    Posts
    1,544
    Quote Originally Posted by Jared Sankovich View Post
    I prefer the order of face frames, then doors and drawer fronts and finally boxes.
    I like this approach too, saves space without all the boxes sitting around.

    If you are putting this between two walls, measure the distance between walls at the back and at the outer edge and make your box smaller than that. Make the face frame and scribe to the walls or leave room for a small molding that is scribed and attached after the cabinet is set.

  7. #7
    Join Date
    Nov 2006
    Location
    Atlanta
    Posts
    1,602
    If you’re not doing inset doors and drawers , why do face frame cabinetry at all ?

  8. #8
    Join Date
    Mar 2003
    Location
    SE PA - Central Bucks County
    Posts
    66,016
    Quote Originally Posted by Dave Sabo View Post
    If you’re not doing inset doors and drawers , why do face frame cabinetry at all ?
    OP doesn't say anything about doors/drawers.
    -----

    Stephen, I can see this work being done either way. Historically, I've done the cabinet boxes first and fitted the face frames to them in the shop, but installed the face frames after the boxes were secured in place so any scribing would be done to match the actual wall. Out wet bar cabinet in the media room had to be done that way as did one area in our kitchen where I was filling up a fake fireplace to make it actually usable space. I personally think I would continue to do it that way, but can appreciate face frame first, too. The thing is, that means it's a lot more critical to be dead on with the carcasses as it's slightly more difficult to fit them to the face frame vs the opposite. Subjective thing for sure.
    --

    The most expensive tool is the one you buy "cheaply" and often...

  9. #9
    Quote Originally Posted by Dave Sabo View Post
    If you’re not doing inset doors and drawers , why do face frame cabinetry at all ?
    Dave - Fair question. I've asked the boss to tell me what she wants it to look like. it could wind up being a sleek European look. If that's the way I go (no face frame) then how do I get a tight fit against a wall if I don't have excess face frame to scribe?

  10. #10
    Lots to think about. So grateful to those who share their expertise!

  11. #11
    Join Date
    Dec 2013
    Location
    Central New Jersey
    Posts
    1,010
    I just built a vanity, well, it's two 30" cabinets that will make a 60" vanity. I built the face frames first and had planned all the required groves for the box sides/bottom to fit into. Than built the boxes and put it all together. Doors and drawers were last.

  12. #12
    Join Date
    Feb 2014
    Location
    Lake Gaston, Henrico, NC
    Posts
    9,184
    I don't see where it makes much difference. When I was building cabinets, they were built in the house I was building. I'd build the boxes first, and go put them in place as soon as they were built, then build face frames. If you're going to have one, or the other sitting around, your process will depend on that.

  13. #13
    Join Date
    Dec 2013
    Location
    Central New Jersey
    Posts
    1,010
    Quote Originally Posted by Tom M King View Post
    I don't see where it makes much difference. When I was building cabinets, they were built in the house I was building. I'd build the boxes first, and go put them in place as soon as they were built, then build face frames. If you're going to have one, or the other sitting around, your process will depend on that.
    If you run groves in the face frame to improve the joinery to the box, having the face frame built first make fitting the box into the grooves much easier. And if you make a goof on a cut with the box, you mess up so easy to get plywood vs that hand-selected pieced of hardwood used for the face frame.

  14. #14
    Join Date
    Mar 2003
    Location
    SE PA - Central Bucks County
    Posts
    66,016
    Quote Originally Posted by stephen wood View Post
    it could wind up being a sleek European look. If that's the way I go (no face frame) then how do I get a tight fit against a wall if I don't have excess face frame to scribe?
    Generally, scribed filler pieces would be used to integrate the cabinet with the surrounding walls.
    --

    The most expensive tool is the one you buy "cheaply" and often...

  15. #15
    Join Date
    Feb 2010
    Location
    Mt Pleasant SC
    Posts
    721
    Then to hide the scribed filler piece use scribe molding which is flexible enough to get tight on the wall. If new construction, hold off on the final scribe molding until the Hvac shrinks the wall.